Ecolab Australia, Macquarie Park NSW

Client
Ecolab Australia Pty Ltd

Project Type
Construction

Completed
2026

Location
Macquarie Park, NSW

Sector
Medical

Duration
16 Weeks

Project Overview

ATG delivered Ecolab Australia’s new national headquarters across three levels, combining a technical Customer Experience Centre with a premium workplace environment while maintaining operations within a live commercial building.

ATG delivered the refurbishment and upgrade of Bay 14 at South Eveleigh under a Design and Construct contract, modernising the heritage listed locomotive workshop while retaining its industrial character. Works included refurbished stairs and balustrades, new ground floor amenities, upgraded amenities on Levels 1 and 2, and refreshed common areas aligned with the adjacent Bay 15.

The project was delivered within a busy, operational precinct. High impact activities such as penetrations and demolition were programmed for early mornings to avoid disruption, supported by controlled access routes and daily coordination with building management. ATG maintained safe access for neighbouring tenants throughout the construction period.

Internal demolition within tenancy pods created an open plan layout and improved circulation. The existing hydraulic lift was replaced with a modern machine room less system, improving reliability and accessibility across all levels. Structural steel remediation and roof replacement were completed while maintaining building integrity and protecting heritage fabric.

Key risks included heritage constraints, live precinct interfaces, lead dust contamination and compliance upgrades across multiple levels. These were managed through staged methodologies, heritage appropriate construction techniques, consultant led coordination, specialist removal processes, controlled access scheduling and progressive sign off of compliance elements.

Quality was maintained through robust ITP processes, trade coordination and regular inspections. Safety systems included isolated work zones, air monitoring, digital induction platforms and daily pre starts. The project delivered a modernised workplace environment while preserving the historical significance of the Bay 14 structure.